CRITICAL SYSTEM RELIABILITY ANALYSIS – POST DISASTER BUILDINGS
Operational requirements for post disaster buildings entail the preparation of a seismic assessment plan that can demonstrate operational reliability and anticipated uptime following an earthquake. PARASIS has incorporated a statistically proven approach based on equipment repair time to the analysis of critical equipment operation for post disaster buildings. Incorporating CSA -S-832 criteria to critical equipment under site specific conditions allows this unique approach to meet the latest code requirements while applying state of the art analysis and proven statistical methods.